Short answer
Industry guidance calls for at least 4 inches of compacted crushed-stone base under patios and walks on well-drained soil, and 6 inches under residential driveways, with more in cold or wet ground. Pavers sit on about 1 inch of screeded concrete sand, are held by an edge restraint, then compacted with joint sand. Most paver failures start in the base.
Key facts
- CMHA recommends a minimum compacted base of 4 inches for patios and walks on well-drained soil and 6 inches for residential driveways, thicker in colder climates or on wet or weak soils.[1]
- Bedding sand should be screeded to an uncompacted nominal 1 inch, and ICPI says not to use mason sand or stone dust for bedding.[2]
- CMHA says paver areas should slope at least 1.5%; the Brick Industry Association recommends at least 1/4 inch per foot (2%) for clay pavers.[3]
The layers, bottom to top
A sand-set paver patio is a flexible pavement. Each layer has a job.
| Layer | What it does | Guidance |
|---|---|---|
| Compacted soil (subgrade) | Supports everything | Compact to at least 98% standard Proctor density (ASTM D698)[1] |
| Geotextile (optional) | Keeps soil from mixing into the base | Used on wet, clay or freeze-thaw soils; at least 12 in overlap downslope[1] |
| Aggregate base | Main structural layer | Crushed, dense-graded stone; 4 in minimum for patios[1] |
| Bedding sand | Seats the pavers | Concrete sand (ASTM C33) screeded to nominal 1 in, uncompacted[1][2] |
| Pavers | Wearing surface | Compacted into the sand, then joint sand added[1] |
| Edge restraint | Stops pavers from spreading | Concrete, plastic, steel or aluminum edging[2] |
How deep should the base be?
| Use | Minimum compacted base | Source |
|---|---|---|
| Patios and walks, well-drained soil | 4 in | CMHA[1] |
| Walks | 4 to 6 in | ICPI[2] |
| Residential driveways | 6 in (CMHA); 6 to 8 in (ICPI) | [1][2] |
| Clay pavers, patios and walks | 4 in | BIA[3] |
CMHA adds that colder climates and continually wet or weak soils need thicker bases[1]. For preliminary design, BIA suggests adding 4 inches of aggregate under driveways on clay or silt soil[3].
The base goes down in lifts, not all at once. CMHA calls for 4 to 6 inch lifts with a 7,000 lbf reversible plate compactor, and thinner lifts with a smaller 5,000 lbf machine. Do not place base on frozen soil or use frozen base material[1]. The finished base surface should be within plus or minus 3/8 inch under a 10 foot straightedge[1].
Step by step
- Call 811 first. The free national before-you-dig service marks buried utilities with paint or flags. Contact it a few business days before digging[4].
- Lay out and set grade. Stake the area and set string lines for slope. CMHA says paver surfaces should slope at least 1.5%[1]. BIA recommends at least 1/4 inch per foot (2%) for clay pavers[3]. Slope away from the house.
- Excavate and compact the soil. Dig to the depth of base plus sand plus paver. Remove roots, organic soil and debris, then compact[1].
- Add geotextile if needed. Over clay, wet ground or in freeze-thaw areas[1].
- Place and compact the base in lifts. Fix low spots in the base with more base material, never with sand[2].
- Install edge restraints. Many go in before the sand; some plastic and metal edging goes in after the pavers. The base should extend past the edge, and on home projects the stakes should sit no more than 10 inches from the base perimeter[2]. CMHA calls for at least 1 inch of vertical restraint against the side of the paver[1].
- Screed the bedding sand. Spread concrete sand and screed it to an even, uncompacted 1 inch[1]. ICPI's range is 1 to 1 1/2 inches, and it should not be used to fill dips[2].
- Lay the pavers. Pull from 3 or 4 bundles at once to blend color. Keep joints 1/16 to 3/16 inch[1]. Cut edge pieces with a saw or splitter, and control the dust: CMHA notes it contains respirable crystalline silica[1].
- Compact the pavers. Use a plate compactor of at least 5,000 lbf at 75 to 90 hertz, with at least two passes[1].
- Fill the joints. Sweep in dry joint sand and compact again until joints are full, which may take two or three passes[1]. Stabilized (polymeric) joint sand is optional and can help where joint sand washes out[1].
HomeGuide estimates a two-person crew lays about 100 square feet of pavers a day, not counting prep[5].
Myths and shortcuts that cause sinking
- "Stone dust makes a good bedding layer." ICPI says stone dust and screenings should not be used for bedding because they can carry too many fines[2].
- "Mason sand is fine under pavers." ICPI says mason sand drains slowly and is unstable as bedding[2]. It can be used in the joints[2].
- "Use extra sand to level the low spots." Thick sand pockets settle. Both CMHA and ICPI say to fix the base, not pad it with sand[1][2].
- "Edging is optional." CMHA calls edge restraints a key part of the system; without them pavers drift and joints open[1].
- "Compacting the pavers will crack them." Compaction is how pavers lock together. ICPI notes a protective pad on the compactor plate can reduce the risk of marking paver faces[2].
What a finished job should look like
- Pavers about 1/8 to 1/4 inch above surrounding edges or drains to allow for minor settling[1].
- No more than 1/8 inch lippage (height difference) between neighboring pavers on walking routes[1].
- Surface within 3/8 inch under a 10 foot straightedge[1].
- Joint lines within 1/2 inch over 50 feet of string line[1].
If a section sinks later, pavers can be lifted, the base repaired and the same units relaid. See fixing sunken pavers.
When to call a pro
- The patio sits next to the house and the yard drains toward it.
- The soil is clay, stays wet, or is on a slope, where base depth and drainage need design.
- The job includes a driveway, steps or a retaining wall.
- You want independent installers to bid a written base spec (depth, material, compaction, edging) so the bids compare.
More questions
Can pavers go straight on dirt or on sand alone?
Not for a lasting patio. Both CMHA and the Brick Industry Association put a compacted aggregate base between the soil and the bedding sand, at least 4 inches for foot traffic [1][3]. Sand alone over soil shifts and settles.
Can pavers go over an existing concrete patio?
Yes, if the slab is sound and drains. The industry guides describe sand-set pavers over a concrete base, with drain holes at the low points so water in the sand can escape [2][3]. A cracked or sinking slab should be fixed or removed first.
Sources
- Tech Note PAV-TEC-002-22: Construction of Interlocking Concrete Pavements (revised March 2022), Concrete Masonry & Hardscapes Association (formerly ICPI). Accessed 2026-10-06.
- ICPI Tech Spec 10: Application Guide for Interlocking Concrete Pavements (approved March 2022), Interlocking Concrete Pavement Institute, hosted by CMHA. Accessed 2026-10-06.
- Technical Note 14A: Paving Systems Using Clay Pavers on a Sand Setting Bed (May 2017), Brick Industry Association. Accessed 2026-10-06.
- 811 Before You Dig, Common Ground Alliance. Accessed 2026-10-06.
- Paver Patio Cost (dated September 18, 2024), HomeGuide. Accessed 2026-10-06.